Shop Refurbishment Photos.
Here we are before the job started removing posters etc.
to clear the shop.
View from the back of the shop
Pictures below are almost a panoramic shot showing the new steel bases with
fresh concrete or ready for the concrete to be cast.

Here we are in happy chaos. We are constantly
moving the machinery around. This view through to the back of the shop shows
the paypoint corner.
The best way to run new wiring, Hot and Cold water, drains
and the paypoint wires is through a set of ducts across the shop floor. (View to
dryers)
The best way to run new wiring, Hot and Cold water, drains
and the paypoint wires is through a set of ducts across the shop floor. (View to
washers.)
The best way to run new wiring, Hot and Cold water, drains
and the paypoint wires is through a set of ducts across the shop floor.
The best way to run new wiring, Hot and Cold water, drains
and the paypoint wires is through a set of ducts across the shop floor.
The best way to run new wiring, Hot and Cold water, drains
and the paypoint wires is through a set of ducts across the shop floor.
The best way to run new wiring, Hot and Cold water, drains
and the paypoint wires is through a set of ducts across the shop floor.
Machines on the plinth at last.
New large washers. (16lb.) The in-fill to the LHS of the
machines (now only four where there used to be five) gives space for an extra
dryer.
New Mammoth and Jumbo size washers. (40lb and 30lb)
Our new paypoint up and running.
The job
has yet to be completed. We had a few delays deciding on a new/second hand
dryer, and couldn't commit to a new floor until the dryer was put in place.